Sometime in mid-eighties MCD had floated a scheme advising users to adopt MCD meters against a specified fee, under which MCD was resposible for working and mintainance of such meters. Many had subscribed , but MCD had not cared to repair/change nonworking faulty meters. They have been billing on average basis. I had also appraoched MCD to replace the meter soon it had stopped working, but they advised me to get it replaced at my own cost or let the status continue. Eversince the MCD has issued ultimatum to rectify faulty meters i and many like me have filed written request to replace the meter since it was provided by MCD under the scheme. It is requested RWABhagidari should take up the matter with MCD and pressurise them to honour the contract.
Thanks
S N Malik
No comments:
Post a Comment