Government agencies are busy to complete scheduled works.
Electricity continuity is a must and in brief I share what was done in ASIAD in1984.
JNU STADIUM
33kv feed was ensured from three different sources.
So was the position in IG STADIUM.
In addition, back up feed from gas turbine was kept ready.
CHECKING OF LINES AND SUBSTATIONS
IP POWER STATION, and 33kv maintenance was having HOT POINTS DETECTION CAMERAS.
It is a must that all joints on at least power stations, grid stations and transmission lines are checked and proper records are kept.
One week before games, strategic locations must be rechecked, load reduced or transferred to avoid over loading.
The battery status needs to be hundred percent ok.
It wil be necessary to check protection schemes and proper operation of circuit breakers.
BREAK DOWN GANGS AND SYSTEM CONTROL
Must be manned by senior most and well versed engineers.
Hope these suggestions wil be considered.