Bhagidari perhaps was started in 2002 at initiative of Shiela ji CM DELHI.
Thereafter DAY TO DAY functions, like parks and anitation was to be entrusted to RWAS.
I am very happy to inform that our Madhuvan RWA has been chosen to take charge of parks in Madhuvan new delhi 110092.
Our rwa has entrusted this work to me.
Honorary secretary Sh.A.C.Agarwal( retired IAS officer) has circulated to all residents of Madhuvan this development.
Perhaps sanitation services will also follow suit.
Now it will be for residents to ensure upkeep of parks.
Kindly advise us what we must do to make the scheme a success.
kk ghei
senior vice president
EDRWA'S JOINT FRONT
Showing posts with label let us ensure it continues. Show all posts
Showing posts with label let us ensure it continues. Show all posts
Tuesday, August 31, 2010
Friday, August 6, 2010
Professionals can help in cwg games
Government agencies are busy to complete scheduled works.
Electricity continuity is a must and in brief I share what was done in ASIAD in1984.
JNU STADIUM
33kv feed was ensured from three different sources.
So was the position in IG STADIUM.
In addition, back up feed from gas turbine was kept ready.
CHECKING OF LINES AND SUBSTATIONS
IP POWER STATION, and 33kv maintenance was having HOT POINTS DETECTION CAMERAS.
It is a must that all joints on at least power stations, grid stations and transmission lines are checked and proper records are kept.
One week before games, strategic locations must be rechecked, load reduced or transferred to avoid over loading.
The battery status needs to be hundred percent ok.
It wil be necessary to check protection schemes and proper operation of circuit breakers.
BREAK DOWN GANGS AND SYSTEM CONTROL
Must be manned by senior most and well versed engineers.
Hope these suggestions wil be considered.
Kk ghei
Electricity continuity is a must and in brief I share what was done in ASIAD in1984.
JNU STADIUM
33kv feed was ensured from three different sources.
So was the position in IG STADIUM.
In addition, back up feed from gas turbine was kept ready.
CHECKING OF LINES AND SUBSTATIONS
IP POWER STATION, and 33kv maintenance was having HOT POINTS DETECTION CAMERAS.
It is a must that all joints on at least power stations, grid stations and transmission lines are checked and proper records are kept.
One week before games, strategic locations must be rechecked, load reduced or transferred to avoid over loading.
The battery status needs to be hundred percent ok.
It wil be necessary to check protection schemes and proper operation of circuit breakers.
BREAK DOWN GANGS AND SYSTEM CONTROL
Must be manned by senior most and well versed engineers.
Hope these suggestions wil be considered.
Kk ghei