Dear Shri Vohra ji,
Sometime in Feb. 2013 DJB had changed meters on their own in our
Block B1A Janakpuri in many of the flats. However in some of the flats which
were locked or where the residents refused to get the new meters in lieu of old
working/nonworking one, they were not changed. Where the new meters were
installed no bills have been served on them since March 2013 in spite reminders. Meter readers visit every two months and record
the readings. Some flat owners of new meters received bills claiming arbitrary
charges not based on readings. When they complained their bills were taken back
for rectification. I cannot understand why DJB is not serving the bills and why
other flat owners were not extended the scheme of replacing the water meters as
done in block B1A.
Vohraji, please take up the matter with DJB to find out how meters
were replaced in some flats and not in the entire area and why claims of water
charges are not being made for more than one year?
Regards,
Satyendra Malik
B1A Janakpuri
Dear Vohra ji,
B3A Block of Janakpuri
is a low income group DDA apartment colony. The water meters were installed by
MCD which were transferred to Jal Board with assets and liabilities. About 85 meters in 300 flats are lying as stopped. Jal
Board has given to RWA in writing that they would replace them. But no action.
They are charging average rate arbitrarily. When the information was sought
through RTI to know the basis of average charging, no reply was given. With the
intervention of Central Information Commissioner, only one meter at B3A/58-A,
Janakpuri was replaced.
I suggest Shri Vohra
to take up the issue with Lt. Governor.
S.K. Chandan,
Chairman, RWA, B3A
Block Janakpuri, New Delhi .